Stamping Shielding Solution for Electrical Device

Equipment
Japanese Machines

Oppervlaktebehandeling
Customers′ Demand

Tolerance
±0.02mm

Process
Stamping/Punching/Bending/Forming/Pressing

Drawing Format
2D/3D/CAD/Dwg//Step/Pdf/Igs

Transportpakket
Blister,Karton,smd,Poly Bag,as Customer′s Requirme

Handelsmerk
A-rainbow

Oorsprong
China

Productiecapaciteit
30000000

Beschrijving


Productomschrijving

Stamping Shielding Solution for Electrical Device

Do you have Drawings?

2D and 3D Drawings

What material do you need?

Stainless Steel:SUS430/304/201/301/303/316

Steel:SPCC/SGCC/SECC/SPTE

Messing:C26800/C26000/C22000 etc

Koper:C11000/C10100/C10200/C12200

Aluminum:AL1050/5052/6061

KFC lead Frame:C194/C19210

Do you have surface finish requirement?

Stainless Steel:Polishing, Passivating, Zandstralen, Laser Engraving

Steel:Zinc Plating,Oxide, Nickel plating, chrome plating, carburized, heat treatment, Powder coated

Aluminum:Clear Anodized, Color anodized, sandblast anodized, chemical film, brushing, polishing, chroming

What is the thickness of the material?

As customer’s requirement

Tolerance

±0.02mm,According to product standards

What is your packing specification?

PE-zak,blister,tray,carton,tape reel,as customer’s requirement

Stamping Shielding Solution for Electrical DeviceStamping Shielding Solution for Electrical Device

Stamping Shielding Solution for Electrical DeviceStamping Shielding Solution for Electrical DeviceStamping Shielding Solution for Electrical DeviceStamping Shielding Solution for Electrical Device

FAQ

Q:Waarom voor ons kiezen?

A:1).Over 40 years experience.

2).We are factory,so we can provide competitive price for you.

3).Our all the tooling spare parts we applied are from MISUMI and the Seibu CNC machines to process the tooling is important from Japan.We are ISO9001 and TS16949 certified factory.

4).Snelle levering.

Q: Heeft u monsters??

A: Yes.We could provide the samples.

Q:What is the delivery time?

A:Because we provide OEM service,it depends on the quantity and difficulty the product.It usually takes about 10-25 werkdagen.

Q:Do you have the products in stock?

A:Nee,all products will be newly produced according to your order including samples.

Q:How does your factory do regarding the quality control?

A:Quality is priority.We always attach great importance to quality control from the beginning to the end of the production.Every product will be full assemble and carefully tested before packing and shipping.

Deliver

Stamping Shielding Solution for Electrical Device