Hot DIP Galvanized Alley Crossarm Brace for Suspension Utility Constructions

N º de Modelo.
38

Paquete de transporte
Caja de cartón, Plt

Especificación
customized size

Marca comercial
EMAX

Origen
Zhejiang, China

Código hs
7326909000

Capacidad de producción
2000pieces/Month

Descripción

Descripción del producto

Nombre del producto: Utility Pole Line Hardware
Material: Steel/Stainless steel/Alumium/Brass/Copper
Surface Treatment: Hot dip galvanized/Powder coating/Zinc Plated/Nickel Plated/Heat treatment/Chrome Plateing/Electrophoresis/Blackening/PVC coating etc.
Tamaño: OEM Customized
Processing: Stamping/Punching/Bending/Tapping/Milling/Lathe/Welding/Assembly/Laser cutting
Grade: First Class
Thread: Coarse,Fine
Certificación: ISO9001,SGS,CTI,ROHS
Industry: Utilities,Fuerza,Overhead construction,Pole line hardware,Line fitting
Country of origin: China
Same Type of Product

EMAX Capability

1.Press:Our stamping machine is from 5Ton to 400Ton(Our max punch 400Ton),we can stamp steel with 12-16mm thickness.
2.Finish we always do:Hot dip galvanized,Zinc Plated,Nickel Plated,Chrome Plated,E coating(electrophoresis),Powder coating,Polish for Stainless steel,Anodizing for Aluminum,and pickling for copper/brass.
3.Material we always use:Q235B steel(S235 in EU),Q345 steel(S355 in EU),Q500 steel(S500 in EU),DC01/SPCC cold rolled steel,Aluminum(6061 o 5053),Copper(T1).
4.Welding and assembly:Hand and Robot Welding,Arc Welding,Co2 protection Welding,or Aluminum Welding.
5.Progressive tooling:We can make progressive mould by ourselves.
etc..
Hot DIP Galvanized Alley Crossarm Brace for Suspension Utility Constructions
Fábrica
Hot DIP Galvanized Alley Crossarm Brace for Suspension Utility ConstructionsHot DIP Galvanized Alley Crossarm Brace for Suspension Utility Constructions
Embalaje&Entrega
Hot DIP Galvanized Alley Crossarm Brace for Suspension Utility Constructions
Custom Photo
Hot DIP Galvanized Alley Crossarm Brace for Suspension Utility Constructions
Preguntas más frecuentes:

q: Are you trading company or manufacturer ?
A: We are factory.
q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
q: Do you provide samples ? is it free or extra ?
A: sí, we could offer the sample for free charge but do not pay the cost of freight.
q: ¿Cuáles son sus condiciones de pago? ?
A: Pago<=1000USD, 100% in advance. Pago>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Hot DIP Galvanized Alley Crossarm Brace for Suspension Utility Constructions